Karol Bagh | IAS GS Foundation Course | date 26 November | 6 PM Call Us
This just in:

State PCS


Haryana

  • 31 Oct 2022
  • 8 min read
  • Switch Date:  
Haryana Switch to Hindi

Haryana will become the First State in the Country to Provide Helipad Facility in Every District in case of Emergency

Why In News?

  • On October 29, 2022, Deputy Chief Minister Dushyant Chautala informed in a meeting with officials of the Civil Aviation Department that Haryana will become the first state in the country to build helipads in every district to provide helicopter landing facility in future war and emergency situations.

Key Points

  • Dushyant Chautala said that with the development of such infrastructure in the state, helicopters can be landed in war and emergency situations and due to the construction of helipads in police lines in view of security, full arrangements will also be made for the security of these helipads.
  • Complete arrangements will also be made to ensure that there is no problem in landing at night at these helipads. He directed to expedite the possibility of setting up a helipad in the district police lines for landing facility.
  • It is known that in the recent Civil Aviation Ministers' Conference, the need to build a helipad in every district of the country to deal with emergencies was emphasized. In this direction, the Haryana government had expressed its desire to take the initiative first.
  • Dushyant Chautala said that the Haryana government has always been at the forefront of implementing the schemes and concepts started by the Central Government in the state. Instructions have been given to the Home Department and the Director General of Police to develop infrastructure for setting up helipads in every district.
  • The Deputy Chief Minister said that an institute will be set up in Haryana to impart airport security training. He directed the officials to identify places in Hisar, Sirsa and Pinjore for this, so that the youth of the state as well as the youth of other states would also be able to get training from this institute. With the formation of this institute, Haryana will be further strengthened in the aviation sector.
  • Dushyant Chautala said that under the regional connectivity scheme UDAN (Ude Desh Ka Aam Nagrik), an action plan is being prepared to tie up with 7 other states for identification of new route from Hisar from April 2023 to strengthen air connectivity. With the success of this action plan, the citizens of the state will get extensive facility to travel by air.

Haryana Switch to Hindi

The Third Meeting of the Committee Constituted by the NGT on Waste Management was held in Bandhwari Gurugram

Why In News?

  • On October 29, 2022, the third meeting of the committee constituted by the National Green Tribunal (NGT) was held at Bandhwari in Gurugram district of Haryana for waste management and proper processing of waste.

Key Points

  • In the meeting of the committee constituted by the National Green Tribunal (NGT), it was decided that the assessment of the waste deposited at the Bandhwari landfill site would be done afresh in a scientific manner and the responsibility has been given to the Regional Officer of Haryana State Pollution Control Board, which is a Will get this work completed in a week, according to which Municipal Corporation of Gurugram will prepare a revised action plan for the disposal of this waste, in which the time limit will be fixed for each activity.
  • A 9-member committee has been constituted under the chairmanship of Haryana State Pollution Control Board Chairman P. Raghavendra Rao, whose members include Sudhir Rajpal, Chief Executive Officer of GMDA, Vineet Garg, ACS of Environment and Climate Change Department, Arun Gupta, ACS of Urban Local Bodies. , Gurugram Municipal Corporation Commissioner Mukesh Ahuja, Faridabad Municipal Corporation Commissioner Jitendra Dahiya, Gurugram Deputy Commissioner Nishant Kumar Yadav, Faridabad Deputy Commissioner Vikram Singh and CPCB Regional Director are involved.
  • In the meeting of the committee, from proper disposal of waste in Bandhwadi to starting leachate treatment plant there and decentralized waste processing, disposal of RDF from waste, legacy waste, legacy leachate, installation of waste to energy plant, arrangements for firefighting. The topics to be done were discussed in detail.
  • It was decided in this meeting that efforts would be made to complete the processing of the entire legacy waste deposited in Bandhwari by the end of March 2023.
  • It was informed in the meeting that action is underway to adopt decentralized waste processing system in Gurugram and Faridabad districts, for which small waste processing plants will be set up in both the cities without carrying garbage at one place. Seven different processing sites have been identified for waste processing. Solid waste and leachate treatment has been planned for each site.
  • It is to be noted that about 2000 metric tonnes of garbage comes daily from both Gurugram and Faridabad.
  • It was informed in the meeting that for leachate treatment, two DTRO plants of 200-200 KLD capacity are being operated in Bandhwari and in addition to this, about 150 KLD capacity leachate treatment plant will also be functional by November 30. The total leachate treatment capacity will be 550 KLD. After this, the daily leachate can be treated simultaneously.
  • It was decided in the meeting that the regional officers of the Pollution Control Board will give a report on leachate treatment every week and as far as legacy leachate is concerned, it will be filled in tankers and sent to the Sewerage Treatment Plant (STP), where the DTRO plant will be installed by GMDA for its treatment.
  • The cooperation of environmentalists will be taken to ensure that these leachate tankers reach the STP from Bandhwari Plant and only after testing the samples of this leachate when the toxic substances in it are in the prescribed approved quantity, then it will be dumped in the sewerage, otherwise No.
  • The meeting also discussed about setting up a waste to energy plant, in which it was told by the Eco-green company that the EPC contract would be signed before November 10 and after that the work of setting up the plant would be started on the ground before December 31, 2022. will be given.

 Switch to Hindi
close
SMS Alerts
Share Page
images-2
images-2
× Snow