Karol Bagh | IAS GS Foundation Course | 17 October | 8 AM. Call Us
This just in:

State PCS




State PCS Current Affairs

Rajasthan

Upper High Level Canal Project

  • 13 Jun 2023
  • 2 min read

Why in News?

On June 12, 2023, Rajasthan Chief Minister Ashok Gehlot laid the foundation stone for the construction of a Siphon on the Anas River under the Upper High-Level Canal Project at Lankai (Bagidaura) in Banswara district of the state and the Rs 2500 crore Upper High-Level Canal Project at Magarda.

Key Points:

  • Six tehsils of the district - Banswara, Bagidaura, Gangad Talai, Anandpuri, Kushalgarh and Sajjangarh - have related to the Upper High-Level Canal Project. This will provide irrigation facility in 42-thousand-hectare area of 338 villages.
  • Here a 105 km long main canal will be constructed from the dam of Mahi project. Irrigation facilities will be provided through fountain method by constructing diggi by removing distributors and minors from the main canal. The work is to be completed by November 2026. It will also have 210 diggies and a 4 km long tunnel.
  • In this project, a siphon is being built on the Anas River. It is located in Lankai village of Gangad tehsil. This is an important structure of the Siphon project. In this, the main canal is proposed to be removed from the bottom of the Anas River through a pressurized pipeline.
  • The canal project is an ambitious project of the tribal region. This will enable sustainable development in the region due to irrigation water assurance and increase employment opportunities. This project will play an important role in the socio-economic upliftment of the region.
  • On this occasion, the Chief Minister also announced the upgradation of Gram Panchayat Chhoti Sarwa of Banswara district to Panchayat Samiti.

close
SMS Alerts
Share Page
images-2
images-2