Chhattisgarh
Inaugurates Tamarind Processing Plant Set Up in Dhuragaon
- 08 Oct 2022
- 1 min read
Why In News?
On October 7, 2022, Chief Minister Bhupesh Baghel inaugurated the tamarind processing plant at Dhuragaon in Lohandiguda development block during his one-day visit to Bastar.
Key Points
- Speaking on the occasion, the Chief Minister said that this will increase the possibility of industrial investment in the region. He said that processing of local forest produce and agricultural produce is necessary for employment generation here and this plant is a big achievement in this direction.
- Plant operator Karthik Kapoor said that this plant has the capacity to make 10 metric tonnes of tamarind pulp, 5 metric tonnes of tamarind chapati and 3 metric tonnes of tamarind seed powder per day.
- The plant is spread over 2 acres with 35000 sq ft of total construction in PEB and puff panel with all modern facilities. A food laboratory has been built here. Along with this, premium quality steel has been used as equipment.
- Here all the norms of FSSAI will be strictly followed. This plant is fully automatic, there is a provision to work in manual mode for power backup, uninterrupted manufacturing.